Work Completed
In this remodeling project, wood panels were removed from a room and replaced with drywall. New trim was installed, and the entire house was primed. The ceilings were painted with flat latex, while the walls were repaired and painted with flat latex, except for the bathrooms and kitchen. The baseboards were painted in white semi-gloss. The job took 4 weeks to complete.
Key Points of the Work Completed
- Removal of wood panels in a room
- Installation of drywall
- Placement of new trim
- Priming the entire house
- Painting ceilings with flat latex
- Repairing and painting walls with flat latex.
- Painting baseboards in white semi-gloss
- Project duration: 4 weeks


Components and Tools Used
High-quality components such as drywall, new trim, primer, flat latex paint for ceilings and walls, and semi-gloss paint for baseboards were used for this project. Tools included saws, hammers, professional rollers and brushes, sanders, and personal protective equipment.
Implementation of the Components
The wood panels were carefully removed and replaced with drywall, providing a more modern and clean finish. New trim was installed for an additional decorative touch. The entire house was primed to ensure proper paint adhesion. Ceilings and walls were painted with flat latex, achieving a uniform and high-quality finish, while the baseboards were painted in white semi-gloss for an elegant touch.
Safety Steps and Devices
To ensure a safe and efficient job, the following steps were followed:
- Preparing the work area and removing wood panels.
- Installing drywall and new trim.
- Priming all surfaces.
- Painting ceilings with flat latex.
- Repairing and painting walls with flat latex.
- Painting baseboards in white semi-gloss.
- Final inspection and quality assurance.
Throughout the process, the team used safety devices such as helmets, gloves, protective goggles, and masks to prevent accidents and ensure a safe work environment.