Work Performed
In this renovation, rotten wood was replaced, the front door was changed, and the brick was waterproofed. Finally, two final coats of paint were applied. The project took 3 weeks to complete.
Main Points of the Work Done
- Replacement of rotten wood
- Front door replacement
- Brick waterproofing
- Application of two final coats of paint
- Project completed in 3 weeks


Components and Tools Used
In this project, high-quality materials were used, including treated wood for replacement, waterproof sealer for the brick, and weather-resistant paint. The tools used included saws, hammers, professional brushes, and rollers.
Implementation of the Components
The rotten wood was carefully removed and replaced with treated, weather-resistant wood. The front door was replaced with a new one, improving the home’s security and aesthetics. The brick was waterproofed with a specialized sealer, ensuring durability.
Safety Steps and Devices
To ensure a safe and efficient job, these steps were followed:
- Evaluation and preparation of the work area.
- Removal and replacement of the rotten wood.
- Installation of the new front door.
- Application of the waterproof sealer on the brick.
- Final painting in two coats.
- Inspection and quality assurance.
The team used safety devices such as helmets, gloves, and protective glasses throughout the process to prevent accidents and ensure a safe working environment.