In May 2023, our team at Cacheiro Remodeling completed an extensive kitchen renovation in Washington, DC. The project involved removing a wall to create more space, installing a 7-foot beam for structural support, and updating the plumbing with PEX A pipes. We also relocated the refrigerator and switch box, installed new candle lights, and fitted granite cabinets. The entire project took four weeks, ensuring thorough structural and plumbing inspections.
Detailed Work Carried Out
The kitchen remodeling project involved several critical steps to ensure a successful outcome. Key tasks included:
- Demolition of existing structures
- Checking for water pipe leaks
- Installing new drywall
- Painting
- Installing cabinets
- Installing countertops
- Installing hardware
- Installing appliances
Components and Tools Used
We used top-quality components and tools to ensure durability and functionality in the remodeled kitchen. Key components included:
- PEX A pipes for new water lines
- Durable drywall for walls
- Premium paint for a polished finish
- Custom granite cabinets
- Modern hardware and appliances (General Electric GE)
Advanced tools such as laser levels, power drills, and pipe cutters were employed to ensure precision in every aspect of the project.
Ensuring Safety and Quality
Throughout the remodeling process, we adhered to strict safety protocols and quality standards. Key safety measures included:
- Shoring up from the basement to the 2nd floor to install the beam
- Regularly checking for structural integrity before and after demolition
- Using protective gear and following safety protocols
- Ensuring proper ventilation during painting and installation
- Conducting thorough structural and plumbing inspections
Our commitment to excellence and attention to detail resulted in a beautiful, functional kitchen that met the client’s needs and adhered to all safety standards.